Phase one
Construction & installation
Everything that is built, buried and covered: structure, reinforcement, waterproofing, pipework, equipment and testing. Sound construction is what makes the finish last.

Why we separate the phases
Construction is tested before it is covered
We complete and test all construction works, then hand the site to the finishing crew. Any defect in waterproofing or pipework shows up before mosaic or marble covers it.
Structural & civil works
Excavation, compaction and blinding, then slab and wall reinforcement, timber formwork and pump-cast reinforced concrete. This is where basin geometry, levels and strength are fixed.
Plumbing & embedded pipework
Return, suction and overflow pipes run within the reinforcement and are fixed before casting, then pressure-tested. Every fitting position comes from the hydraulic drawings.
Waterproofing & insulation
Membranes on walls, floor and penetrations, vapour barriers for saunas and steam rooms, then a fill test before any finishing.
Equipment installation
Hydromassage loungers and seats, fountain nozzle rings, sauna panels: everything that must be fixed before finishing.
MEP & plant rooms
Pumps, filters, manifolds, control panels and dosing units with organised, labelled pipework.
Testing
Pressure tests for pipework and fill tests for basins, then a trial run of pumps and jets before moving to finishing.
Studio
Construction photos
42 photos from our sites.
No images in this category.
Services








Have a space? We can show you what it could become.
Book a site visit and initial consultation. We will come back with a preliminary concept and a clear estimate of cost and time.